Interim report Q1 - 2020

2020-05-27

Interim report for the period January 1 - March 31, 2020

Baseload Capital Sweden AB (publ) today releases the results for the period 1 January – 31 March 2020.

During the first quarter of 2020, the company continued to develop projects in Japan, Taiwan and Iceland. Covid-19 has so far had limited effect on the company; the impact on ongoing projects has led to some delays in some of the projects, but the work has largely been able to proceed as planned. However, travel restrictions mean temporarily less focus on business development.

  • The result for the period was SEK -8.3 million (SEK 9.9 million for the same period in 2019).
  • During the first quarter, work continued on commissioning the first project in Japan, Waita. After the end of the quarter, at the end of April, the power plant went into operation. In the second quarter, the next project, Midori, is expected to be completed.
  • In Taiwan, work is ongoing on a number of projects, where the first power plant is expected to be commissioned during the first half of 2021.
  • In Iceland, a couple of new power plants are expected to be commissioned during the year.
  • The terms of the green bond issued by the company during the first quarter of 2019 have been renegotiated and changed to better suit the company's business model. All covenants that the company must comply with were met during the quarter.
  • During the quarter, the parent company Baseload Capital Holding AB raised a convertible loan of SEK 94.2 million from the principal owners in order to strengthen liquidity.
  • After the end of the quarter, the company has utilized SEK 55.3 million from the bond proceeds for investments in Japan, and SEK 40.5 million for investments in Taiwan.

For more information, please contact:
Alexander Helling, CEO of Baseload Capital
alexander.helling@baseloadcap.com

Johan Edin, CFO of Baseload Capital
johan.edin@baseloadcap.com

RELATED POSTS

The first children’s book about geothermal energy released in Taiwan: Our Hidden powers 

The children's book "Our Hidden Power" from Sweden is officially published in Traditional Chinese – "我們的隱藏力量:風光水火土  打造永續地球", as the first children’s book in Taiwan to introduce geothermal and renewable energy.

BASELOAD POWER TAIWAN SIGNS MOU WITH ACADEMIC PARTNERS TO COLLABORATE ON GEOTHERMAL ENERGY EDUCATION AND TALENT DEVELOPMENT IN TAIWAN

Taipei, Taiwan (May 18, 2023) – Located along the Pacific Ring of Fire, Taiwan is known for its abundant geothermal energy, estimated at a potential 40GW.

地熱能源開發商倍速羅得攜手花蓮紅葉國小,齊力守護太魯閣族歌謠樂舞與文化傳承

花蓮縣萬榮鄉紅葉國小近年翻轉教育思惟,不囿於偏鄉匱乏,不盲目追求第一,重塑傳統文化課程,帶領孩子看見所處的美好土地與文化瑰寶,以作為獨一無二的部落後代,感到榮耀與自信。
1 2 3 8
menuchevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram