Interim Report Q1 -2021

2021-05-27

Interim report for the period 1 January – 31 March 2021

During the first quarter of 2021, Baseload closed a capital round of USD 25m with Chevron Technology Ventures (“Chevron”) as a new strategic investor.

  • The result for the first quarter was SEK -31.0 million (SEK -8.3 million for the same period in 2020).​​​​​​
  • In Japan, work continues on the third project for Baseload Power Japan. Called Sansui, it is a small project where an existing onsen-well is used to run two Climeon modules. The project is strategically important to be able to expand with larger projects in the vicinity.
  • In Taiwan, drilling is back in full swing at the Westlake project with a depth of 900 meters and a target of 1200 meters. According to the new schedule, drilling should be completed by the end of May or the beginning of June.
  • In Iceland, Varmaorka commissioned phase 2 of the Fludir project, and started up an additional 600 kW of power, which gives Fludir 1 & 2 a total capacity of 1200 kW. The work for phase three has also begun, with an evaluation of whether we can build an additional 500 to 1500 kW on the site.
  • In the US, Baseload has signed an LOI together with Chevron’s Technology Center to build a pilot project on an existing well.

The information was submitted for publication at 07:30 CET on 26 May 2021.

This disclosure contains information that Baseload Capital Sweden AB is obliged to make public pursuant to the EU Market Abuse Regulation (EU nr 596/2014). The information was submitted for publication, through the agency of the contact person, on 26-05-2021 07:30 CET.

For more information, please contact:
Alexander Helling CEO of Baseload Capital
alexander.helling@baseloadcap.com

>> Get the full update from our quarterly report here.

RELATED POSTS

The first children’s book about geothermal energy released in Taiwan: Our Hidden powers 

The children's book "Our Hidden Power" from Sweden is officially published in Traditional Chinese – "我們的隱藏力量:風光水火土  打造永續地球", as the first children’s book in Taiwan to introduce geothermal and renewable energy.

BASELOAD POWER TAIWAN SIGNS MOU WITH ACADEMIC PARTNERS TO COLLABORATE ON GEOTHERMAL ENERGY EDUCATION AND TALENT DEVELOPMENT IN TAIWAN

Taipei, Taiwan (May 18, 2023) – Located along the Pacific Ring of Fire, Taiwan is known for its abundant geothermal energy, estimated at a potential 40GW.

地熱能源開發商倍速羅得攜手花蓮紅葉國小,齊力守護太魯閣族歌謠樂舞與文化傳承

花蓮縣萬榮鄉紅葉國小近年翻轉教育思惟,不囿於偏鄉匱乏,不盲目追求第一,重塑傳統文化課程,帶領孩子看見所處的美好土地與文化瑰寶,以作為獨一無二的部落後代,感到榮耀與自信。
1 2 3 8
menuchevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram